Watch the session:
Download the slides:
Adlernico Brioche
|
MIN
The Site Visit with Turner Construction Part Two: The VDC Edge
Part two follows Turner's VDC engineer, whose work on this job reaches well past MEP into structural steel, concrete and sitework. He walks through scanning a space with his phone, getting it processed in about thirty minutes, and bringing that real-world data back against the coordinated model to see where a conflict came from before anyone starts adjusting in the field.

